Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Remove Pipe Insulation from Battery Room 100 in Building 772-7B.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Analysis of water samples using liquid scintillation spectrometry.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
This EEC will cover pH, conductivity, and deuterium by FTIR methods as they apply to the analysis of basin water samples from K and L areas. This a…
CX(s) Applied: B5.1, Building Technologies Office, Location(s): Nationwide, Office(s): Golden Field Office
This revision addresses changes to the original project scope. The size of the proposed has been reduced to about 510 ft2 and will be used to store…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), is proposing to rebuild and upgrade the existing single-circuit Miracle Mile…