Award Number: DE-EE0008837, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office
UT will conduct a field laboratory validation of a sensor system that provides data at UT’s Devine Geophysical Test Site.…
Legacy insulation needs to be removed from Rm 602 in HB-Line. The insulation will be handled as asbestos.…
HB-Line will be entering Lay-Up status. The Process Air (PRA) system for HB-Line will not be needed to support the facility while in this configura…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Remove Pipe Insulation from Battery Room 100 in Building 772-7B.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Analysis of water samples using liquid scintillation spectrometry.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…