Bonneville Power Administration (BPA) proposes to decommission communication components at multiple substations and radio facilities in its #KC reg…
Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…
The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…
Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
Overhaul pump EFP #1 at 902-5B.…
Remove receptacles and non-load bearing wall between Rooms10 &11 in Building 773-63A.…
Currently, the Pantex Plant has a large volume of surplus container inventories. The proposed action would consist of leasing an off-site storage …
The activities covered in this CX are for using active electro seismic (ASE) in place of PES. CXs for UND EERC locations in Grand Forks, ND and Gre…
Bonneville Power Administration (Bonneville) proposes to respond to low inflow conditions at Lake Roosevelt, the reservoir behind Grand Coulee Dam,…
The scope of the project involves performing several demonstration runs for candidate thirdparty companies.…