Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…
Main Feeder Utility Pole Treatment requiring soil disturbances within the B, D, L, K, and General Technical Areas. …
Painting interior of 701-1L…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Replace failed flow transmitter for RWM-02 Recovering Well located in A/M Areas. …
The subcontractor shall supply all labor, materials, pesticides, transportation and supervision necessary to perform bimonthly industrial pest cont…
FirstEnergy Solutions Corp – Davis-Besse Nuclear Power Station (DBNPS), in collaboration with Idaho National Laboratory (INL), Arizona Public Servi…
The purpose of this revision is to add international scope for the Idaho National Laboratory (INL) Radiological Source Disposition Project funded b…
The proposed action, funded by Idaho National Laboratory (INL), remodels a laboratory in the Center for Advanced Energy Studies (CAES) to facilitat…
Design for comprehensive engineering plans including data analysis, reviews, and document preparation.…