Bonneville Power Administration (BPA) proposes to replace two existing transmission line structures with new structures (Grand Coulee-Foster Creek …
The obsolete discrete HVAC controllers in HB Line will be replaced with DCS control.…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
Replacement of tile, carpet and sheet rock due to water damage / mold growth from water leak in heater room in 704-C…
This proposed activity will remove wallpaper, paint walls, and remove carpet from Building 703-H.…
The proposed activity will perform asbestos abatement work in the H Canyon Hot Gang Valve Corridor (HGVC).…
Perform excavation activities and install additional cathodic protection around the fuel tank to support testing at 715-F Fuel Station.…
The U.S. Department of Energy proposes to install a temporary tensile (tent-like) structure in its "Old Town" area to provide centrally located, in…
GSA has a contract with Iron Bow Technologies to provide and install a Cisco Unified Communication system to replace NETL's telephone systems and c…