Correct leak and replace valve SW-V-001(10") at 681-3G Pump House #3.…
This activity involves installing a MicroBlower™ at existing well MRS-34. Furthermore, three existing vadose zone wells (i.e., MVE-13, MVE-17, and…
Bonneville Power Administration (Bonneville) is currently proposing to enter into an EIM implementation agreement with CAISO which would obligate B…
The Recipient will develop methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processin…
Program management, development of high temperature sensor materials, and additive manufacturing. …
Build and optimize an electrical plume collection system and test it in a high-fidelity lab testing and in actual field conditions on an industrial…
Project Management; bench-scale testing activities; techno-economic studies; marketing analysis; data analysis; coal sample shipping; design/machin…
Paper Front-End Engineering Design (FEED) Study to complete a Commercial Carbon Capture Design & Costing Study Extension for the NPPD Gerald Gentle…
DOE LM is proposing to (1) install a new fiber/data line from the existing Building 46 to the existing Building 7 to allow for future employee use …