NRECA will develop tunable, adoptable code for cycling costs of large coal boilers. It will comprise: a) a system level physics-based model
Support DOE in meeting the DOE GMD and EMP goals, providing high quality deliverables to fulfill the DOE tasks directed in the Executive Order on E…
Removal and replacement of cracked sidewalks throughout MGN site and sealing of joints on upper level of parking garage. Approximate estimate for c…
The project team will complete a Front-End Engineering & Design (FEED) study on the addition of a post-combustion carbon capture system onto an exi…
The primary objectives of the research are to address key challenges of CCUS projects, facilitate data collection, sharing and analysis, assess tra…
Award Number: N/A, CX(s) Applied: A9, Water Power Technologies Office, Location(s): DC, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency jumper replacement on Structure 4/2 of the Miracle Mi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency relocation of Structure 39/3 on the Flaming Gorge-Ver…
The Provo River Project consists of a powerplant on a dam at Deer Creek on the Provo River in central Utah. The Deer Creek power station has an ins…
Western Area Power Administration proposes a 5-year Provo River Project Firm Power Formula Rate through March 31, 2025, which is unchanged from the…