CX-023175: Archer-Stegall No. 1 115-kV Transmission Line Structure Replacements

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 29/2 through 30/1 on the Archer-Steg…

Office of NEPA Policy and Compliance

February 3, 2021
Estimated Read Time   min

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 29/2 through 30/1 on the Archer-Stegall No. 1 (ARH-SG-1) 115-kV Transmission Line in Laramie County, Wyoming.