Remove and repair/replace exhaust fan in bathroom/locker change room of Building 704-H to ensure proper air flow in common areas.…
Remount the first sink in the men's restroom in Building 706-19C.…
Remove damaged carpet, paneling, and correct drainage in 719-N.…
Design, construction, and testing of prototype Reversible Solid Oxide Cell (RSOC) system for energy storage and electricity production.…
The arriving equipment includes electronic coating systems, environmental/desiccant/humidity/thermal evaporator chambers, wall-mount DI water syste…
This revision adds Gate 4 as a testing location.…
The University of California, San Diego proposes to characterize the effects of high temperatures (up to 200 C) on the mechanisms and material prop…
Field-based hydraulic fracturing and Rich Gas EOR research program for horizontal shale wells focusing on reducing and minimizing potential environ…
This revision is to update the project description for the paving areas east and northeast of TAN-629 that are depicted in Figure 2.…
The Advanced Test Reactor Complex machine shop, building TRA-662, contains old machines/equipment that need to be removed and sent to excess proper…