Purchase, install and operate two modular office units located within the Idaho Nuclear Technology and Engineering Center (INTEC) Facility.…
Decommissioning and demolition of buildings 389B and 390.…
The objective is to develop a continuous motion Direct Air Capture (DAC) system that will capture CO2 from the air and produce a >95 percent purity…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to perform administrative, planning, non-experimental research...
709-1G, Replace damaged tile and wallboard in ladies shower.…
The proposed action would include general PNNL business activities, award of contracts, a variety of information gathering techniques including lit…
Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
BPA proposes to fund the Colville Confederated Tribe (CCT) to construct instream structures [Beaver Dam Analogs and Post Assisted Log Structures] a…
In the Application, as relevant here, DECP asks DOE/FE to extend its 20-year export term in Order No. 3331-A to a term ending on December 31, 2050.