CX-023383: Estes-Lyons 115-kV Transmission Line Temporary Structure Installation

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install a temporary structure on the Estes-Lyons (E-LS) 115-kV T…

Office of NEPA Policy and Compliance

March 8, 2021
Estimated Read Time   min

Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install a temporary structure on the Estes-Lyons (E-LS) 115-kV Transmission Line in Larimer County, Colorado, between Structures 14/3 and 14/4.