This project would remove and dispose of the components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium pur…
Office of NEPA Policy and Compliance
March 7, 2021This project would remove and dispose of the components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium purification system (TPS) process piping, (all located in the tritium area in the D-Site basement), one neutral beam box (of three located in the TFTR test cell), contaminated VAC ductwork (from both locations), and control room components (located separatelyin the D-Site basement).