BPA proposes to fund the Upper Columbia Monitoring Project (UCM), a research project administered by the Confederated Bands and Tribes of the Yakam…
BPA proposes to allow M and H Subdivision to install a paved asphalt road, buried sewer, water, and electric service lines, and improve an existing…
Proposed modificaton installs electrical componets for Saltstone Screw Feeder System upgrade.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
Project Management and Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Install an open steel shed to park/protect government equipment.…
Construction to pour concrete pad for outdoor unit installation East side of 704-72S and install Ductless Heat Pump on pad and install three High W…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…
702-A Water Intrusion Recovery.…