Optimization and Evaluation of Energy Savings for Connected and Autonomous Off-Road Vehicles …
Install a 25-foot-high × 14-inch-wide Communication Mast that would house a camera and a microwave antenna.…
Award Number: DE-EE0008969, CX(s) Applied: A9, B3.3, B3.6, Water Power Technologies Office, Location(s): MA, Office(s): Golden Field Office
BPA proposes to continue funding the Confederated Tribes of Umatilla Indian Reservation and Confederated Tribes and Bands of the Yakama Nation for …
BPA proposes to fund the Confederated Salish and Kootenai Tribes to purchase the 78-acre Crow and 30-acre Post Creek properties in Lake County, Mon…
Preparation of lab samples includes sectioning, mounting (hot and cold methods), planar grinding, polishing, heat treating, chemical etching, and e…
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
Rational Electrolyte Design for Li-ion Batteries with Micro-Sized Si Anodes…
The objective is to design, construct, and test a novel, high-performance CO electrolysis reactor that produces two concentrated product streams: e…
Remodel the 1st and portions of the 2nd floors of B17 East Wing to provide updated offices with new furniture, doors, and fire suppression system, …