The subcontractor shall provide all transportation, test/repair equipment, labor and technical supervision to perform on-site testing, inspection, …
This document covers the support activities of equipment rental, purchase of materials, and services under FFPO supervision for oil caverns and bri…
Workover (operations to restore production, such as deepening, plugging back, pulling and resetting lines, and squeeze cementing) of existing wells (including, but not limited to, activities associated with brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, oil) to restore functionality,
Award Number: DE-EE0008927, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): WA, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to allow an adjacent landowner to pave a 550-foot section of existing gravel road located on the sou…
Bonneville Power Administration (BPA) proposes to allow Clark Public Utility District (Clark PUD) to install underground electric service lines on …
The SLCA/IP consists of the CRSP units and its participating projects, Dolores and Seedskadee, as well as two small individual projects, Rio Grande…
Bonneville Power Administration (BPA) proposes to reterminate an existing transmission line and add related equipment at its Monroe Substation in S…
Subcontractor will provide roof repairs at 773-63A. The Subcontractor “will not” disturb the existing roof while performing these repairs on 773-63…
A new metal-organic framework (MOF) will be tested for removing pertechnetate from a sample of SRS high level waste…