Award Number: DE-EE0008823, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): CO, Office(s): Golden Field Office
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to approve an interconnection request from PacifiCorp (dba RockyMoun…
Western Area Power Administration (WAPA), RockyMountain Region (RMR), proposes to replace damaged wooden H-frame structures along itsSidney-Big Spr…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace twenty-two (22) existing wood structures along its Beaver…
Award Number: DE-EE0008982, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-EE0008572, CX(s) Applied: A9, A11, Solar Energy Technologies Office, Location(s): PA, Office(s): Golden Field Office
The DCF installs a rupture disk assembly on the HBMS attached to each spent hydride bed stored in HANM and TEF.…
Replace ramp and deck on andi-houses 705-9H and 705-55H.…
Install the 200kW SOFC system prototype at FCE, CT. Disengage/Disassemble one of the 100 kW Modules for postmortem autopsy at Versa. Continue opera…