The proposal is to convert Forms Monitor to Stack Monitor in HAOM (or 234-H) when spare part is no longer available to perform corrective maintenan…
Remove and replace drywall in areas affected by the flooded floors in Buildings 730-1B, 730-2B, and 730-4B. This will also include removal and repl…
Replace bridge across the ditch located at 703-1B…
Install Universal Wiring (UW) drop in Building 730-2B, Cubicle 2082 and Room 113 (Collaboration Room).…
Replace secondary chill water pump and motor-007 at 785-6A.…
This study will investigate metal removal by the A-01 Constructed Wetlands at the Savannah River Site by comparing previously collected long-term d…
Award Number: DE-EE0008974, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0008962, CX(s) Applied: A9, B3.6, B5.15, Wind Energy Technologies Office, Location(s): SC, Office(s): Golden Field Office
CX-101652: Coupled Aerodynamic and Hydrodynamic Hybrid Simulation of Floating Offshore Wind Turbines
Award Number: DE-EE0008960, CX(s) Applied: A9, B5.15, Wind Energy Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0008849, CX(s) Applied: A9, B3.6, CX: B3.15, Fuel Cell Technologies Office, Location(s): IL, Office(s): Golden Field Office