The proposed action involves aerial application of bulk sagebrush seed to areas burned by the Sheep Fire in July 2019 by Thomas Helicopter, a com…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008834, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…