The proposed action replaces the dial pressure indicators with digital gauges and installs instrument calibration valves on the Advanced Test React…
During a preconstruction meeting, it was identified that approximately 5,000 yards of excess topsoil will be removed from the MFC parking lot to ma…
The purpose of this revision is to capture additional detail regarding the standard beryllium placed in the I-Loop to moderate neutron flux. The Ad…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…
The latest capability upgrade requirement is to add LTE Band 4 and Band 5 capability to the existing Wireless Test Bed (WTB) LTE Network. To implem…
This EC revision includes a handful of scope additions. …
The proposed action involves aerial application of bulk sagebrush seed to areas burned by the Sheep Fire in July 2019 by Thomas Helicopter, a com…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008834, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office