Sabine Pass Liquefaction, LLC (Sabine Pass), a Delaware limited liability company with its primary place of business in Houston, Texas, filed an...
Subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perf…
The project would remove and dispose of components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium purifica…
This environmental checklist (EC) covers one experiment module configuration to house the seven fuel pin bundle. This bundle configuration serves a…
The proposed action replaces the dial pressure indicators with digital gauges and installs instrument calibration valves on the Advanced Test React…
During a preconstruction meeting, it was identified that approximately 5,000 yards of excess topsoil will be removed from the MFC parking lot to ma…
The purpose of this revision is to capture additional detail regarding the standard beryllium placed in the I-Loop to moderate neutron flux. The Ad…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…
The latest capability upgrade requirement is to add LTE Band 4 and Band 5 capability to the existing Wireless Test Bed (WTB) LTE Network. To implem…
This EC revision includes a handful of scope additions. …