Modified SOPO, addition of Lucid Energy, field work (monitoring) at two sites, the acquisition of core and geophysical logs, and the acquisition of…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.2, NREL, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0009249, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): CA, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to complete Stage 04 maintenance at its Poncha (PON)…
USG No. 112 has requested the use of INL and surrounding areas to conduct radio frequency (RF) testing and research.…
BPA proposes to fund the Upper Columbia Monitoring Project (UCM), a research project administered by the Confederated Bands and Tribes of the Yakam…
BPA proposes to allow M and H Subdivision to install a paved asphalt road, buried sewer, water, and electric service lines, and improve an existing…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…
Proposed modificaton installs electrical componets for Saltstone Screw Feeder System upgrade.…