D and R of K-Area Purification Steam Supply Line…
The activity will allow for introduction of air into the sample loop to "clean up" and evacuate tritium holdup.…
Repaint grey and yellow areas at the 772-F Sample Tunnel Lift.…
Handi-House, SRS-PB-00514, is to be demolished due the structure collapsing.…
Renovate exterior of wall of Room 332 in Building 730-4B to include wallpaper removal, painting, and vinyl lettering.…
The scope of work would include the demolition of Building 12-034 and the associated ramp (buildings 12-034SS, 12-R-034, and 12-019P). …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Ault – Craig (AU-…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 0/5 and 5/7 on its Flatiron to Dixon …
B3 Reactor Laboratory permits the operation of three reactor systems. High Performance Reactor 1, High Performance Reactor 2, and the Multi Impurit…
The project aims to deliver a safe, effective, low cost solution to assist with the monetization of economically stranded resources via subsea well…