This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required.…
Install a new 3-Ton HVAC unit to provide conditioned air to the Water Jet Area to prevent costly maintenance to the Water Jet computer.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
Housekeeping the 105-C Stack Area.…
Installation of flow restricting orifices on flammable gas cylinder installations throughout 773-A Section C.…
The Krieger project is a proposed advanced technology test of radiological/nuclear detection equipment (gamma and neutron detection).…
This DCF provides the design for the following functions: (1) Isolating Mass Spec 20 from Mass Spec 22 by blanking the interconnect manifold to all…
Remove existing water fountains and replace with hands free water dispensers in Buildings 717-F, 705-3C, 705-C, 704-1N,719-5N, and 704-3N.…
This EEC includes all cell, molecular, and microbial biological research performed within the BSL2 laboratory located in 999-1W ACTL facility, in l…
H-Area Engineering Stratays 3D Printer and accompanying Support Cleaning Apparatus (SCA) which will be used to remove support material from items p…