Bonneville Power Administration proposes to fund ongoing operation and maintenance (O&M) and installation of PIT tag infrastructure for the adminis…
Bonneville Power Administration (BPA) proposes to raise the Ostrander-Pearl No. 1 transmission line including raising the height of structure 10/6 …
CX-021156: Roof Replacements and Thermal Performance Improvements at Garrison and Keeler Substations
Bonneville Power Administration (BPA) is proposing to conduct activities to improve thermal efficiency and moisture retention in buildings at two B…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Terry Ranch Road …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Upper Molina Sub…
Award Number: DE-EE0008912, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): SC, Office(s): Golden Field Office
Award Number: GFO-FishProtectionPrize-001, CX(s) Applied: A9, A11, Water Power Technologies Office, Location(s): DC, Office(s): Golden Field Office
Award Number: DE-EE0009028, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): FL, Office(s): Golden Field Office
Award Number: DE-EE0009014, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Catalyst synthesis and gas phase reaction testing for the production of aromatic hydrocarbons from methane.…