Remove out-of-service steam line section near 717-A.…
Electrical load consolidation from Motor Control Center (MCC) MCC-32M1 to MCC-38M1.…
Testing will be performed in the 773-A E-wing Shielded Cells to assess the impact of increased fissile loading in glass on glass durability.…
The purpose of this activity is to modify/improve mechanical properties for a thermosetting polymer extrusion process.…
Replace existing General Services (GS) hydrogen supply isolation valves with new Safety Significant (SS) valves.…
Develop and demonstrate a field deployable, multifunctional smart pavement system made from domestic coal-derived solid carbon materials.…
This project will develop at bench scale advanced lithium-ion battery (LIB) anodes from lignite-derived carbon materials.…
In the Application, as relevant here, Port Arthur LNG asks DOE/FE to extend its 20-year export term in Order No. 4372 ending on December 2050
In the Application, as relevant here, SPL asks DOE/FE to extend its 20-year export term in Order Nos. 2961-A (as amended), 3669 (as amended), and 379
This Amended Determination is to reflect a name change of the Prime Recipient of Award # DE-AR0000925 ("Design of Large Scale Macroalgae Systems…