Repair door and pressure wash 707-67B and 707-66B.…
This instrument will be used to characterize solid/powder materials both morphologically and chemically through image and EDS (Energy Dispersive X-…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Clemson University (Clemson) to research and de…
Bonneville Power Administration (BPA) proposes to allow Verizon to upgrade their antennas and equipment at an existing site called Rocky Flats. The…
The existing failed BESS inverter will be removed and replaced with a new inverter supplied by a different vendor. This will also require the repl…
An advisory team will be built to engage stakeholders, Preferred Subcontractor/Sub-recipient L and T DES will baseline the current energy scenario …
Relocate existing OH distribution line to a more resilient road accessible underground line. Upgrading to an advanced switchgear yard within the ex…
Collection of acid mine drainage water from the Scaffold Lick and McKean 14 Properties site, the Boggs Rd Passive Treatment site, the Codogan site,…
This project is an in-place upgrade to existing protective devices and utility poles.…
The existing caulking on the exterior of the 291-F Breech House is deteriorating and will be repaired by applying silicone over the existing caulki…