Bonneville Power Administration (BPA) proposes to allow QTS Hillsboro II, LLC (the applicant) to install an underground sanitary sewer pipeline thr…
Traverse Electric Cooperative will be rebuilding 8.2 miles of distribution three-phase overhead power line to three-phase underground construction …
Bonneville Power Administration (BPA) is proposing to replace three deteriorating wood pole structures, any associated hardware and guys, and elect…
Bonneville Power Administration (BPA) proposes to allow Verizon to establish a new wireless telecommunications site (Tacoma Crest) on structure 19/…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and …
The project will create a hub of readily available, easy-to-access, inventory of essential equipment that otherwise has long lead times to be able …
Add 2 pole-mounted communicable electronic reclosers and 1 pad-mounted communicable electronic switch to pre-existing poles and ground sleeve for t…
Reroute existing overhear distribution lines as identified to existing roadway ROW's with underground distribution lines.…
The Klickitat PUD will upgrade approximately 7.5 miles of old, outdated poles, some dating back to 1947. The current poles will be replaced with ta…
Build a 9.75 mile 3-phase overhead distribution electric line on private property along HWY 30 to connect two distribution feeders. This will consi…