The proposed project is to upgrade the fire alarm system for EBR-1 to meet the standards in the National Fire Protection Association (NFPA) Code, s…
This Idaho National Laboratory (INL) project is a collaboration to test an innovative overhead superconducting power line. The project will be cond…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 18), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…
Installation of Single Wide Trailer at 711-6N.…
The JEOL JSM-6480LV SEM, along with all peripheral attachments, are to be removed and replaced by a new SEM and its needed peripheral attachments
This Idaho National Laboratory (INL) irradiation project, the Accelerated Testing of Materials in Capsules (AToMiC), is a series of Joint ExpErimen…
Through publication in the Federal Register on June 28, 2024, the Rocky Mountain (RM) region, under Rate Order No. WAPA-212, entered into a rate ad…
Cut out 2 blisters and install a 20 feet x 3 feet patch using cement and membrane. Install a 3 inches drain insert using water block and an 8 feet …
INL must sustain assets by completing installation or improvements to building and equipment instrumentation activities to assure mission readiness…
The scope of work associated with this project is the post-irradiation examination (PIE) at INL's MFC on the irradiated commercial fuel rods delive…