This EEC covers the building of a new room for B-level storage in 713-N.…
The project will be targeting poles that are currently over 50 years old and have a transformer. In addition, priority will be placed on transforme…
On June 8, 2025, the Fermilab Fire Department (FFD) was dispatched to Lab A for an Automatic Fire Alarm (AFA). Upon investigation, crews discovered…
Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5…
Funding will support the project team's small-scale research and development of a technology approach to large-scale, dynamic energy transport by using electrochemical processes and existing logistics infrastructure by leveraging globally abundant, non-critical metals to serve as energy carriers and innovative metal-air fuel cells and low temperature metal electrolyzers for energy conversion.
The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.
On June 8, 2025, the Fermilab Fire Department (FFD) was dispatched to Lab A for an Automatic Fire Alarm (AFA).
Flooding into NM3 and 4 building was discovered in July. Investigation revealed a domestic water leak from a cross pipe running between NS2 and NM5.
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sit…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access for Marine Energy Research (TEAMER) program.