Operate an advanced sensors development laboratory at the NETL Pittsburgh Site in B-83, R-315., B-83, R-221., B-94, R-003., B-94, R-206., B-94, R-2…
Montezuma County Hospital District will be purchasing a microgrid controller and BESS to create a microgrid capable of handling the load of the hos…
The proposed activity is for site maintenance to drain all refrigerant from equipment in building 211-9F.…
The U.S. Department of Energy (DOE) Hanford Field Office (HFO) and Hecate Energy Cereza LLC (Hecate) propose to construct a photovoltaic solar farm…
The primary objective of this project is to demonstrate the performance, resilience, and cost-effectiveness of a 100kW/1.2MWh Bio-Mineralized Lithi…
Remove and replace damaged sheetrock and install access door for valves behind the wall at 709-7G. Prep and paint sheetrock.…
Replace and re-route the conductors used for the north side motor on TRU Pad 3 in E-Area. Remove the receptacles mounted to the south side of the P…
The current Portable Air Compressors have recently been replaced to increase reliability of backup process air. In addition to these new 3 compress…
Lab 144 is used by Hydrogen Processing Group for general R and D activities. These activities include using the cold saw, drill press, and belt san…
Operation of spark plasma sintering (SPS) equipment in HTRL 136.…