Bonneville Power Administration (BPA) proposes to allow Panattoni to amend an existing easement on BPA fee-owned property in Township 22 North Rang…
Bonneville Power Administration (BPA) is proposing to replace its aging VHF radio system at two northwest Montana radio stations: Miller Peak in Mi…
The Power Conditioner in 735-B Room 508 has failed and is being replaced with a new transformer.…
Replace 702-1C Stand-by Diesel Generator.…
Install telecommunications to bldg. 704-41G. This includes installing grounding, pulling cables, installing 4x8 sheet of plywood and painting it.…
623-29G Install BARD type A/C unit.…
623-34G Install BARD type A/C unit.…
D and R abandoned air compressor, dryer, piping, and supports under awning on west side of 725-1N.…
Savannah River Site (SRS) has identified potential locations that could support a utility-scale solar power plant to achieve the goal of 100 percen…
This proposal is for a 3-year extension (2025-2028) to Cooperative Agreement DE-FC02-04ER54698. The proposal includes General Atomics' role as host…