We will conduct tracer testing, fiber optic measurements, and establish circulation operations in order to characterize the fractures created at th…
Perform site characterization and sampling, construct stratigraphic wells, and complete laboratory analysis of samples.…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…
Assembly of modules, Laboratory scale research, Testing of battery system in an outdoor research facility, Final assembly of ESS, and Installation …
Sub-recipient will develop a Wildfire Mitigation Plan, to assess and reduce wildfire risk, and improve the reliability and resilience of the AE ele…
Install two (2) new monitoring and control points on existing utility poles in existing ROW.…
The Idaho National Laboratory (INL) Natural Phenomena Hazards group is collecting seismic data in support New Data Collection Initiatives. Earthqua…
This revision includes modification to the Year 1 scope and involves building a reactor experiment set up and gathering data. In Year 1, a non-radi…
CX-034131: Access Road Improvement for Residential Use on North Bonneville-Midway No. 1 Right-of-Way
Bonneville Power Administration (BPA) proposes to allow a private landowner to use and improve or perform maintenance on portions of existing acces…
Bonneville Power Administration (BPA) is proposing to replace two steel lattice towers on the Sammamish-Maple Valley No. 1 transmission line (15/5 …