Replacing of wood poles on the Faith-Eagle Butte 115kV Line to the Eagle Butte Substation. Project will utilize the same holes and locations of the…
Replacing of wood poles on the Faith-Eagle Butte 115kV Line to the Eagle Butte Substation. Project will utilize the same holes and locations of the…
This project is to add a 115kV ring bus or a 115kV breaker and half to the Eagle Butte Substation.…
Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular…
WAPA proposes to replace spacers on spans along the ODA-TCY transmission line.…
Raider is a new 115kV switching station located east of Ellsworth Air Force Base on the EWA-NU line.…
Demolish existing Devil's Lake Crew Quarters and Garage and design and build a replacement.…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The project includes WAPA temporarily re-routing a section of its Edgeley to Forman 69 kV transmission line that collapsed into TAD lake along the …
All activities will occur within areas previously disturbed by construction and operation of WAPA and Basin Electric Coop facilities.…