The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The project includes WAPA temporarily re-routing a section of its Edgeley to Forman 69 kV transmission line that collapsed into TAD lake along the …
All activities will occur within areas previously disturbed by construction and operation of WAPA and Basin Electric Coop facilities.…
WAPA-UGP proposes revised formula rates for the P-SMBP-ED firm power, firm peaking power service, and sale of surplus products.…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No 2 230kV transmission line, between structures 66-3-6…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No. 2 230kV transmission line, between structures 66/3-…
The NDDOT and FHWA are proposing to upgrade approximately 62 miles of US HWY-85 to accommodate additional lanes of traffic.…
WAPA is proposing to rebuild the damaged structures in a location closer to the bridge and highway.…
WAPA's proposed action is to grant the South Dakota Air National Guard's request for a multiple use of our transmission facility's ROW.…
Building will utilize existing Rapid City utilities and existing access roads.…