WAPA-UGP proposed revised formula rates for the P-SMBP--ED firm power, firm peaking power service, and sale of surplus products.…
EREC has requested a 115kV bay addition at the WAPA Letcher Substation.…
Installation of new fiber-optic cable from the WAPA Watertown Static VAR to Basin's Watertown Repeater Building located on WAPA land.…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
WAPA is proposing to raise some of its structures along our Oahe to Glenham transmission line.…
Installation of underground conduit and fiber-optic cable from the WAPA Forman control building to a vault installed by Ottertail Power on WAPA pro…
Extension of underground work originally submitted in 2018 for 30/5 to 30/6 to be expanded all the way to 30/3. Project includes installation of un…
The Western Area Power Administration (WAPA) has received a new interconnection request from East River Electric Power Co. (EREPC) for a Tap locati…
The NDDOT and FHWA are proposing to finish upgrading approximately 62 miles of US HWY-85 to accommodate additional lanes of traffic. NDDOT/ FHWA's …