Extension of underground work originally submitted in 2018 for 30/5 to 30/6 to be expanded all the way to 30/3. Project includes installation of un…
The Western Area Power Administration (WAPA) has received a new interconnection request from East River Electric Power Co. (EREPC) for a Tap locati…
The NDDOT and FHWA are proposing to finish upgrading approximately 62 miles of US HWY-85 to accommodate additional lanes of traffic. NDDOT/ FHWA's …
Replacing of wood poles on the Faith-Eagle Butte 115kV Line to the Eagle Butte Substation. Project will utilize the same holes and locations of the…
Replacing of wood poles on the Faith-Eagle Butte 115kV Line to the Eagle Butte Substation. Project will utilize the same holes and locations of the…
This project is to add a 115kV ring bus or a 115kV breaker and half to the Eagle Butte Substation.…
Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular…
WAPA proposes to replace spacers on spans along the ODA-TCY transmission line.…
Raider is a new 115kV switching station located east of Ellsworth Air Force Base on the EWA-NU line.…
Demolish existing Devil's Lake Crew Quarters and Garage and design and build a replacement.…