WAPA is finishing the rebuild of Great Falls to Verona 161 kV. The rebuild will use 230 kV wood and Glued Laminated structures and add OPGW. Ther…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Rerouting 3 transmission line structures on the JT-FA No.1 230 kV Transmission line. Current transmission lines are located in a wetland and could …
Remove and dispose of existing New Underwood communications building, tower, footers/concrete, and propane tank. The New Underwood Communication Si…
East River Electric is building the Moody County Switching station on WAPA's Flandreau - Sioux Falls 115 Kv transmission line between structures 40…
East River Electric Power Cooperative (ERC) is upgrading the Arlington Tap facility on the WAPA Watertown - Brookings 115 kV transmission line. WAP…
WAPA would acquire additional land around Wessington Springs Substation to mitigate erosion from the substation and minimize damages from neighbori…
The proposed actions consists of adding a grounding transformer to the Woonsocket Substation. Staff would also move the fence between the gates out…
Western Area Power Administration (WAPA) proposes issuing an Outgrant for Nemont Telephone to install buried fiber line serving the Wolf Point Mont…
CX-033553: Pick-Sloan Missouri Basin Program -Eastern Division (P-SMBP--ED): Rate Order No. WAPA-218
WAPA-UGP is proposing to use new formula-based methodology for UGP’s rate implementation and annual update procedures with changes related to the p…