WAPA proposes to repair its fence at Carrinton Substation and add snow gates to the Jamestown, Edgeley, and Carrington Substations.…
Western Area Power Administration (WAPA), Upper Great Plains Region (UGP), is proposing to conduct a geotechnical investigation to inform the desig…
East River requested a new bay addition at WAPA's Beresford Substation in South Dakota. …
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection (POI) at the existing Denison Substation to accommoda…
Southwest Power Pool (SPP) issued a Notice to Construct to rebuild 4 miles of WAPAs existing 115kV transmission line from Gavins Point Substation t…
Western Area Power Administration (WAPA) proposes to repair the existing parking lot and road surfaces at the Bismarck Office, Bismarck Warehouse, …
Western Area Power Administration (WAPA) has determined that the existing 2.07-acre Moorhead Microwave property and microwave tower are no longer n…
WAPA is finishing the rebuild of Great Falls to Verona 161 kV. The rebuild will use 230 kV wood and Glued Laminated structures and add OPGW. Ther…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Rerouting 3 transmission line structures on the JT-FA No.1 230 kV Transmission line. Current transmission lines are located in a wetland and could …