WAPA-UGP proposes revised formula rates for the P-SMBP-ED firm power, firm peaking power service, and sale of surplus products.…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No 2 230kV transmission line, between structures 66-3-6…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No. 2 230kV transmission line, between structures 66/3-…
The NDDOT and FHWA are proposing to upgrade approximately 62 miles of US HWY-85 to accommodate additional lanes of traffic.…
WAPA is proposing to rebuild the damaged structures in a location closer to the bridge and highway.…
WAPA's proposed action is to grant the South Dakota Air National Guard's request for a multiple use of our transmission facility's ROW.…
Building will utilize existing Rapid City utilities and existing access roads.…
The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …
Construct a new maintenance building and septic drainage field on existing WAPA-owned land and adjacent to the existing Sioux Falls Substation.…
WAPA is proposing to relocate the structures 43/4 to 43/7 to the south of HV\N 2 in order to address a safety issue where the current structures ar…