The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …
Construct a new maintenance building and septic drainage field on existing WAPA-owned land and adjacent to the existing Sioux Falls Substation.…
WAPA is proposing to relocate the structures 43/4 to 43/7 to the south of HV\N 2 in order to address a safety issue where the current structures ar…
WAPA has been negotiating a Right-of-Way (ROW) renewal along the Yellowtail-Custer Transmission Line and access road clarification with the Crow Tr…
Due to rising water levels on Lake Taayer, several structures along the Edgeley to Foreman line must be relocated.…
The project scope includes the following, expand the yard to the southeast for a new 115-kV area, replace transformer KY1 A and relocate, construc…
WAPA proposes to demolish the existing building and construct a new building, with the intent to reuse the current foundation. The project also in…
Beresford Municipal Utilities (BMU) is proposing to construct a new 115kV electrical transmission line to source a new substation to be constructed…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Categorical Exclusion Determination