Towner Switchyard Construction CX(s) Applied: B4.11Date: 06/08/2015 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Mingusville Tap CX(s) Applied: B4.11Date: 06/08/2015 Location(s): MontanaOffices(s): Western Area Power Administration-Upper Great Plains Region
Reconstruction of the V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Reconstruction of the V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Reconstruction of V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-170 CX(s) Applied: B4.3Date: 03/10/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Upper Great Plains Region
Pick-Sloan Missouri Basin Program- Eastern Division- Rate Order No. WAPA-170 CX(s) Applied: B4.3Date: 03/10/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Upper Great Plains Region
Rapid City Substation Dry Creek Substation Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Construction of the Rapid City-Dry 115 kilovolt Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Edgeley Substation CX(s) Applied: B4.6 Date: 11/19/2013 Location(s): North Dakota Offices(s): Western Area Power Administration-Upper Great Plains Region