Under Phase 2, the recipient will perform modelling efforts to develop the cyber-physical components needed to adapt the NETL HYPER so that NETL ca…
Develop an economically viable process for production of coal-derived aerogel envelope as thermal-insulated building material with low-cost product…
Oregon State University proposes to develop an experimental database of progressive benchmarks with increasing complexity, to be able to validate s…
Remove existing roof layers of Building 6 (except roof decking) and replace with new roofing materials.…
Sorbent synthesis, characterization, and testing and process modeling.…
Construction of a new JOULE 3.0 / 2-story Computational Science and Engineering (CSE) facility located in the area where B7, T43 and T45 will be de…
Construction of a new security building in the area across Fumich Avenue from B14. The structure will be no larger than approximately 2500 s.f. and…
Demolish and removal from site B7 and finish area to grade with seed and straw.…
Consolidate racks in the data center and enclose with a clear partition.…
VoICE-MR, Vocation Integrated Cost Estimation for Maintenance and Repair of Alternative Fuel Vehicles-AFV…