B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
The Optical Sensors Lab is a development lab applying laser technology and optical measurement techniques to diagnostic problems related to combust…
Replace boiler #3 in B39. Work includes removing existing boiler #3 including disconnecting all electrical and plumbing and installing new boiler i…
Installation of a 110/208v back-up generator for Building 17. …
To conceptualize hybrid power systems technology, simulate such concepts experimentally, and analyze their steady and transient responses in order …
Remove existing roof layers of Building 5 (except roof decking) and replace with new roofing materials.…
Develop and test a treatment process that utilizes produced water and waste heat to create chemical and energy synergisms in cooling tower blowdown…
A platform by which materials (sorbents, oxygen carriers, solid fuels) can be evaluated in different reaction environments. …
The project is used for laboratory scale combustion and sensors research. It is set up for safe handling of cylinder gases, including fuel gases, o…