B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
The Optical Sensors Lab is a development lab applying laser technology and optical measurement techniques to diagnostic problems related to combust…
Replace boiler #3 in B39. Work includes removing existing boiler #3 including disconnecting all electrical and plumbing and installing new boiler i…
Installation of a 110/208v back-up generator for Building 17. …
To conceptualize hybrid power systems technology, simulate such concepts experimentally, and analyze their steady and transient responses in order …
Remove existing roof layers of Building 5 (except roof decking) and replace with new roofing materials.…
Develop and test a treatment process that utilizes produced water and waste heat to create chemical and energy synergisms in cooling tower blowdown…
A platform by which materials (sorbents, oxygen carriers, solid fuels) can be evaluated in different reaction environments. …
The project is used for laboratory scale combustion and sensors research. It is set up for safe handling of cylinder gases, including fuel gases, o…
The project will perform LIBS experiments