Remove existing roof layers of Building 6 (except roof decking) and replace with new roofing materials.…
Sorbent synthesis, characterization, and testing and process modeling.…
Construction of a new JOULE 3.0 / 2-story Computational Science and Engineering (CSE) facility located in the area where B7, T43 and T45 will be de…
Construction of a new security building in the area across Fumich Avenue from B14. The structure will be no larger than approximately 2500 s.f. and…
Demolish and removal from site B7 and finish area to grade with seed and straw.…
Consolidate racks in the data center and enclose with a clear partition.…
VoICE-MR, Vocation Integrated Cost Estimation for Maintenance and Repair of Alternative Fuel Vehicles-AFV…
The PPC project experimentally measures the gas velocity and turbulent intensity of the flow adjacent to test coupons. This update includes the add…
The Raman gas composition monitor measures the Raman scattering of laser light. The primary application is for measuring the composition of fuel ga…
The doorway will be removed, widened, and replaced.…