April 3, 2020

CX-021439: B3 Exterior Insulation and Finish System Repair

Repair, resurface, and repaint the EIFS. …

February 26, 2020

CX-021361: Remodeling of B2 and B3 as MOD to B26 Remodel

Several offices and spaces will be remodeled to move people from B2 and B3.…

February 20, 2020

CX-021364: B6 High-Pressure Combustion Facility Air Preheater (H-0001) Replacement

Remove the existing B6 HPCF air preheater and replace with an in-kind preheater at the same location.  The location is the North side of B6 approxi…

February 19, 2020

CX-021370: Multiphase Flow Analysis Lab

Utilized for laboratory and bench scale analyses involving the preparation and characterization of granular materials and the operation of small-sc…

February 18, 2020

CX-101726: Intermediate Temperature Proton-Conducting Solid Oxide Electrolysis Cells with Improved Performance and Durability

Award Number: DE-EE0008378, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): WV, Office(s): Golden Field Office

January 29, 2020

CX-021252: Addition of RAMAN Sensor to Kinetics and Catalysis Lab

A highly flexible lab-scale platform to explore fundamental and applied research and development issues that are inherent in catalytic reactions fo…

January 29, 2020

CX-021253: Addition of Applied Microwave Facility

The Applied Microwave Facility (AMF) will be a highly flexible lab-scale platform for the development of microwave hardware used to explore microwa…

January 14, 2020

CX-021260: B3 Reactor Laboratory

B3 Reactor Laboratory permits the operation of three reactor systems. High Performance Reactor 1, High Performance Reactor 2, and the Multi Impurit…

December 9, 2019

CX-021023: Ongoing Operations and Routine Actions at the Legacy Management Business Center (LMBC)

DOE LM is proposing to conduct the following ongoing operations activities and routine maintenance actions at the DOE LMBC, a U.S. General Services…

October 23, 2019

CX-020810: B25 Room 112 Fume Hood Removal and Disposal

Removal and proper disposal of 2 fume hoods located in Room 112 of building B25. The fume hoods have asbestos containing panels. …