The design proposes that a gutter will be installed under each joint at the upper level.…
Removal of all existing HVAC air handling systems throughout the building and the installation of one new packaged air handling unit installed on g…
Demolish and remove from site both T43 and T45 and finish area to grade with seed and straw. …
Repair, resurface, and repaint the EIFS. …
Several offices and spaces will be remodeled to move people from B2 and B3.…
Remove the existing B6 HPCF air preheater and replace with an in-kind preheater at the same location. The location is the North side of B6 approxi…
Utilized for laboratory and bench scale analyses involving the preparation and characterization of granular materials and the operation of small-sc…
Award Number: DE-EE0008378, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): WV, Office(s): Golden Field Office
A highly flexible lab-scale platform to explore fundamental and applied research and development issues that are inherent in catalytic reactions fo…
The Applied Microwave Facility (AMF) will be a highly flexible lab-scale platform for the development of microwave hardware used to explore microwa…