To conceptualize hybrid power systems technology, simulate such concepts experimentally, and analyze their steady and transient responses in order …
Remove existing roof layers of Building 5 (except roof decking) and replace with new roofing materials.…
Develop and test a treatment process that utilizes produced water and waste heat to create chemical and energy synergisms in cooling tower blowdown…
A platform by which materials (sorbents, oxygen carriers, solid fuels) can be evaluated in different reaction environments. …
The project is used for laboratory scale combustion and sensors research. It is set up for safe handling of cylinder gases, including fuel gases, o…
The project will perform LIBS experiments
Replace or repair targeted exterior doors for several buildings at the NETL Morgantown site that are currently in poor condition. …
The BAC behind B5 will be demolished as per the attached SOW.…
Collection and disposal of non-hazardous waste and recyclables.…
Install additional insulation in exterior wall and miscellaneous voids. Maximum wall insulation coverage area is anticipated to not exceed 1,000 sq…