Replace or repair targeted exterior doors for several buildings at the NETL Morgantown site that are currently in poor condition. …
The BAC behind B5 will be demolished as per the attached SOW.…
Collection and disposal of non-hazardous waste and recyclables.…
Install additional insulation in exterior wall and miscellaneous voids. Maximum wall insulation coverage area is anticipated to not exceed 1,000 sq…
2 HVAC units with excessive service calls past their expected life cycle will be replaced with better up to date equipment.…
Remove 8 small hotel unit HVACs, replace with DOAS system or similar via design build.…
Unit needs resized/replaced.…
The existing B4 lower roof will be removed and replaced with a new bitumen roofing system. The EIFS will be repaired, resurfaced, and repainted. Ha…
Perform testing, evaluation, and advanced development of SOFC fuel cell technology. This mod will add 5 new test stands to the project for a total …
Remove 3 heating, ventilation, air conditioning units and replace with 3 new heating, ventilation, air conditioning units. The units are located on…