Categorical Exclusion Determinations: Savannah River Operations Office

Operation of Tube Furnace for Synthesis of Hydrogen Storage MaterialsCX(s) Applied: B3.6Date: 07/22/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Design, Procure, and Install a Dewatering Transfer Pump in Waste Tank 4, Riser 6, for Heel RemovalCX(s) Applied: B1.3Date: 07/22/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Post Load Leak Test for 9975/9977/9978 Containment Vessels Using Model S1A-L2-V Leak TesterCX(s) Applied: B3.6Date: 07/12/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office