Categorical Exclusion Determinations: Savannah River Operations Office

Design and Construct H Tank Farm East Hill Utilities UpgradesCX(s) Applied: B1.3Date: 09/02/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Work in the 723-A High Pressure LaboratoryCX(s) Applied: B3.6Date: 09/02/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Tank 13 Well Water System ModificationCX(s) Applied: B1.3Date: 09/02/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Removing Lead Base Paint and Primer from Crane Trolley PlateCX(s) Applied: B3.6Date: 09/01/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, National Energy Technology Laboratory
Add Isolation Valves in F Diversion Box 2 (FDB-2) Modified Leak Detection Box (MLDBs) to Support Pressure TestingCX(s) Applied: B2.5Date: 08/31/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Install H Tank Farm to F Tank Farm Radio Repeater Station in E AreaCX(s) Applied: B1.19Date: 08/31/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Relocation of Trailers in 100-R and 100-P AreasCX(s) Applied: B1.22Date: 08/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Install New Power Poles in A & B AreasCX(s) Applied: B1.3Date: 08/22/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office