Pave a Parking Space Near Building 730-A CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove the Highpoint VAMP ED-641000-IT-RISH-6097A From Service CX(s) Applied: B2.2 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Preparation of Used Lead for Off-Site Shipment for Recycle CX(s) Applied: B6.8 Date: 08/02/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Splicing of 480 VAC Cathodic Protection Power Cables CX(s) Applied: B2.5 Date: 07/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Removal of Out-of-Service Railroad Segment CX(s) Applied: B1.23 Date: 07/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Removal of Out-of-Service Steam Line Segment CX(s) Applied: B1.23 Date: 07/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Concrete Culverts Storage in K-Area CX(s) Applied: B1.30 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pilot Scale Hanford Mixing Studies with Cohesive Simulants, Phase III, and Solids Accumulation Scouting Studies CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation of 3013 Outer Can Welder (OCW) CX(s) Applied: B1.3 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office