CX-014495: Categorical Exclusion Determination

Reservoir Finishing Relocation to HANM CX(s) Applied: B1.31Date: 10/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

October 27, 2015
Estimated Read Time   min
Reservoir Finishing Relocation to HANM
CX(s) Applied: B1.31
Date: 10/27/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Move the trimming and gauging, hot air decontamination (HAD), and final decontamination functions to 233-H, Room 31 in Finishing Line One (FL1). The new reservoir finishing system will consist of redundant work stations for HAD, a Trim and Gauge area, and space for final decontamination. Convert the existing Finishing Line 1 glovebox to an airhood.

Document(s) Available for Download