Replace and Relocate Uninterruptible Power Supply Y100 CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Gate Cycle Counters for 701-1K and 701-2K Vehicle Gates CX(s) Applied: B2.2Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Ballistic Resistance Enclosure Turret Rotation CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Relocate Beavers from Ponds Feeding Outfalls N-15 and N-16 CX(s) Applied: B1.3Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Ni-plating of Microscopy Coupons CX(s) Applied: B3.6Date: 03/15/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Ventilation System for the Sodium Nitrite Makeup Tank (SNMUT) CX(s) Applied: B1.3Date: 03/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Characterization of Process Solutions and Solids CX(s) Applied: B3.6Date: 03/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Characterization of Process Solutions and Solids CX(s) Applied: B3.6Date: 03/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3Date: 03/07/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fabrication of Alloys With Trace Depleted Uranium in 1750 C Tube Furnace With Argon Cover in D-0142 CX(s) Applied: B3.6Date: 03/07/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office