Replace UPS System in Building 701-2L CX(s) Applied: B2.2Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Boral Specimen Examination and Testing CX(s) Applied: B3.6Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 105-L (Disassembly Curb) CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Disposal of Damaged SeaLand Container (PB# SRS-PB-00572) from Salvage Yard CX(s) Applied: B1.23Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Decontamination of a Gaseous Diffusion Membrane - Phase I CX(s) Applied: B3.6Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Asphalt and Concrete Crushing CX(s) Applied: B6.8Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Obsolete SRTE Glovebox Oxygen Monitor (e.g. Delta F, Panametric, etc.) With Newer Rosemount Oxygen Analyzer CX(s) Applied: B2.2Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install New Freezestats in the 233-H Supply Air Handling Unit CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at K-Area (Crane Area) CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Drain Fire Water Tank in B-Area CX(s) Applied: B1.3Date: 04/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office