Repair and Replace Concrete Apron and Concrete Channels at H-Area Hazardous Waste Management Facility CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
241-100H Roof Replacement CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Removal of Norshield Door at C-Area Reactor Building CX(s) Applied: B2.5Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 772-1F, Lab Number 156 CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
K-Area Security Ready Room Additional Heating, Ventilation, and Air Conditioning Units CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dismantlement and Removal of K-Area Purification Steam Supply Line CX(s) Applied: B1.27Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove/Replace Floor Tile at 702-K & 702-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
New Heating, Ventilation, and Air-Conditioning System for L-Area Complex CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 713-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office