Evaporation of IX Simulant for Mark-18 CX(s) Applied: B3.6Date: 08/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dismantle and Remove M-1 Air Stripper Catalytic Oxidation Unit and its Associated Equipment CX(s) Applied: B1.23Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-46A CX(s) Applied: B1.3Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 735-2B CX(s) Applied: B1.3Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
719-H Heating, Ventilation, and Air Conditioning Upgrade Project CX(s) Applied: B1.15, B2.1Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Design for Installation of New Power and Energy High Pressure Diffuser Assembly Stages in Tritium Facilities CX(s) Applied: B1.31Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 645-1N CX(s) Applied: B1.3Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-A, D-1122 (Revision 0) and D-1176 (Revision 1) CX(s) Applied: B1.3Date: 08/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Use of Small Honda Generators in F-Area CX(s) Applied: B1.31Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation, Operation, and Removal of Nonproliferation Technologies Section Sampling Systems for Measurement of 291-H Stack Effluent CX(s) Applied: B3.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office