Remove current fire alarm equipment and install new equipment in its place.…
780-2A Chemical tank removal and grout chemical dike.…
736-A Room 104,107, and 108 Remodel.…
Replace soda ash piping and pumps at 607-59G.…
The scope of the activity includes the chipping and removal of material approximately 1.5 ft x 4 ft to expose the area in front of the recycle sump…
The installation of IAEA surveillance systems and electrical power in the Criticality Control Overpacks (CCO) Pad Storage Facility, 163-70K, to all…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
Fourier Transform Infrared (FTIR) uses a beam of infrared light to analyze a sample in a non-destructive manner.…
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by the Environmental and Legac…
A desktop injection molder, the Proto-Ject by manning Innovations, will be used to mold thermomechanical test specimens.…