Categorical Exclusion Determinations: B4.9

Land Use Agreement for Driveway Expansion in the Ross-Lexington Transmission Line Corridor CX(s) Applied: B4.9Date: 42529 Location(s): WashingtonOffices(s): Bonneville Power Administration
Installation of Metering Equipment near North Bench and Bonners Ferry Substations CX(s) Applied: B4.9Date: 04/01/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Edgeley Groton 115 Kilovolt Transmission Line Relocation CX(s) Applied: B4.9, B4.13Date: 03/31/2016 Location(s): North DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region